Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 13, 2023

August 14, 2023

September 25, 2023

450 S Sunrise Way

Site Work

No Information to Display

$184,800.00

Public - City

img_map_placeholder

450 S Sunrise Way, Palm Springs, CA

Subscribe to View Full Documents

Remove existing drain lines and install (one) new curb drain inlet with 6" drain line to existing storm drain on Sunrise Way. The work includes but is not limited to installing demolition of existing flat work, installing new drain inlets and outlets to the existing site, adding channel drains at entrance, adding overflow outlet, erosion control at existing down spouts and rain gutters, and pouring flatwork and new path of travel from public way to the main entrance. Re-install Landscaping where disturbed. The work shall be diligently prosecuted to completion before the expiration of 30 working days. License Requirements A or C34 Liquidated Damages $1,900 / Day Question Deadline 06/27/2023 at 3:00 PM PT Online Q&A Yes

28 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.