Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 15, 2024

December 16, 2024

No Information to Display

Gilham Rd

Paving, Site Work

No Information to Display

$5,000,000.00

Public - County

img_map_placeholder

Gilham Rd, Eugene, OR

138

20

4

3

Subscribe to View Full Documents

Lane Countygilham Road: Ayers Road to Mirror Pond Way Bids Due 10:00 Am, October 15, 2024 Advertisement for Bid project Information Project Name Gilham Road: Ayers Road to Mirror Pond Way. Scope of Work: Grading, Drainage & Paving Class of Project: Federal-aid Project Class of Work Earthwork and Drainage Asphalt Concrete Paving and Oiling Project Cost Range $2 Mil - $5 Mil *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Assigned Dbe Goal: 10% Buy America Requirements: This Federal-aid Project Has Buy America and Build America, Buy America Requirements. Completion Time: See Special Provision Subsection 00180.50(H) Pre-bid Meeting: No Pre-bid Meeting Will Be Held for This Project. Project Wage Rates All projects have minimum wage rate requirements. See the Project Bid Booklet and the General Conditions for Construction for Lane County for more information. PREQUALIFICATION REQUIRED Contractors must be prequalified with the Oregon Department of Transportation (ODOT), which will prequalify Bidders according to ODOT's Oregon Administrative Rules and prequalification procedures. The Agency will consider a Bid from a Bidder whose complete application for prequalification has been received by the ODOT Procurement Office - Construction Contracts Unit at least 10 Calendar Days before the opening of Bids. See Lane County General Conditions for Construction for detailed requirements. MAJOR PAY ITEMS AND ESTIMATED QUANTITIES Req. approx. 350 HR training; 450 SF temp sign; ; 800 HR flag; 210 FT PCD; 3400 SF temp walk; 68 EA inlet protect; 270 FT sed fence; 1,065 TON contam. soil disp.; 2431 CY gen ex; 600 SY 18" subg stab; 4,000 SY subg geotextile; 1505 FT storm pipe; 12 manholes; 16 inlets; 3 modular ret walls; 2,400 TON aggr base; 1,500 TON ACP; 1,900 FT curbs; 4,400 SF conc dwys; 10,030 SF conc walk; 27 EA curb ramps; 300 SF trunc dome; 7,000 FT thermo stripe; 8 stormwater planters; 220 CY topsoil; 140 CY blended soil; 1900 EA 4-inch pots Lane County may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of Lane County that it is in the public interest to do so. Lane County is an Equal Opportunity and Affirmative Action Employer. Lane County provides equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State Laws, rules, and regulations.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.