Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

November 25, 2024

No Information to Display

4400 Vestal Pkwy E

Renovation

No Information to Display

$1,500,000.00

Public - State/Provincial

img_map_placeholder

4400 Vestal Pkwy E, Binghamton, NY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

The State University Construction Fund (SUCF) is seeking Statements of Qualifications (SOQs) from consultants to provide design and construction administration services for the Replace Roofs-Various Buildings project at State University of New York at Binghamton. The Project is the replacement of roofs at the Garage, Physical Facilities, Central Heating Plant, and Warehouse. The Garage, constructed in 1960, is an 8,450 GSF one-story building that serves as the campus' main garage for facilities vehicles. Physical Facilities and Physical Facilities North, constructed in 1960 and 2003 respectively, is a 41,716 GSF two-story building with multiple roof areas that houses the physical plant, design, and construction offices. The Warehouse building, constructed in 1965, is a 9,880 GSF one-story building that houses storage of supplies and equipment for the University. The Central Heating Plant, constructed in 1966, is a 68,786 GSF, five-story building that serves as the campus' main heating plant. A comprehensive roof scan conducted in 2022 determined multiple water infiltration issues at all buildings. The entire roofing system is to be replaced including membrane, insulation, and all other components of the roofing system. Existing parapets may require modifications. Ancillary work including replacing skylights, providing safety tie offs, and concrete repair is also included. Work at the Garage and Warehouse includes removal of EPDM roofing and metal edging on mostly open roof areas. The EPDM roofs over the Physical Facilities building and Physical Facilities North include multiple roof levels and coordination with clerestory glazing, large mechanical equipment on dunnage, and skylights. The EPDM roofs over the Central Heating Plant include multiple roof levels, and coordination with numerous mechanical equipment of various sizes, steel dunnage, ductwork, and moveable and fixed railing systems Questions regarding this opportunity should only be emailed to SUCF.ConsultantProcurement@suny.edu. The deadline to submit questions is Thursday, September 12, 2024, at 11:00 AM. The Fund will issue answers via email using email addresses supplied at registration

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects