Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 8, 2024

November 7, 2024

December 22, 2024

14 McNamara Ave

Demolition, Site Work

No Information to Display

$20,000.00

Public - County

img_map_placeholder

14 McNamara Ave, Binghamton, NY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

The Broome County Land Bank is soliciting quotations for one-time internal demolition, removal, and disposal of all internal debris and materials for the following property: 14 McNamara Avenue, Binghamton, NY 13903. Please do not hesitate to call me at (607) 778-6001 with any questions. A single-family residence on Binghamton's Southside, this property contains approximately 1,463 sq ft of living space, and the removal of materials will encompass all levels of the home, including the basement, first floor, second floor, and attic. The residence was acquired by the Broome County Land Bank Corporation (BCLBC) following tax foreclosure by Broome County Government and is slated for a full rehabilitation by the BCLBC. To further this renovation project, and due to the extensive internal fire damage at the residence, the BCLBC is soliciting quotes for full internal demolition of the residence before issuing a bid package for rehabilitation. Service-Disabled Veteran-Owned Set Aside: No It is anticipated that a contract will be awarded by October 22, 2024 to the lowest responsible bidder(s). This is a one-time contract. The work is expected to be completed within 45 days of the award. The Land Bank reserves the right to reject any and all responses received. One-Time Internal Demolition, Removal, and Disposal of Debris and Materials One-time internal demolition, removal, and disposal of all materials from the interior of the residence. The contract will outline the specific tasks and items that must be removed and disposed of from all levels of the residence. This includes, but is not limited to, the following: o Removal of all wall materials down to interior and exterior 2x stud framing. o Removal of all ceiling materials including furring, ceiling tiles, lath, plaster and other ceiling substrates down to the floor/ roof framing o Remove all batt and/or spray foam insulation o Remove all interior doors, frames, hardware and trim o Remove all interior window, trim and baseboard trim o Removal of all cabinets, counters, fixtures, hardware and trim o Remove all flooring materials, including: hardwood flooring, carpet, padding, tack strips, staples, top layer of flooring materials (VCT, linoleum and tiles) o Remove all bathroom fixtures, wall and floor tile, hardware and misc. items. Cap plumbing as required. o Items to remain in place: Interior and exterior 2x wall framing, floor/ roof framing, subflooring, structural supports, stairs, railings, exterior windows, exterior doors, plumbing, HVAC, electrical wiring, outlets, switches Davis Bacon Prevailing Wage is not applicable to this contract.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects