Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

March 11, 2024

May 10, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$1,237,578.00

Public - City

img_map_placeholder

Multiple Locations, Brawley, CA

24

9

2

Subscribe to View Full Documents

PROJECT DESCRIPTION: The Work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents. The street improvements at various locations 2nd Street from the intersection of K Street to the intersection of Malan Street, H Street from the intersection of South Las Flores Drive to the intersection of South Rio Vista Avenue, and 3rd Street from the intersection of River Drive to the intersection of A Street. The improvements consist of asphalt concrete header cut 1 inch and 5 feet wide. After header cut activities have been completed the contractor shall install a 0.75-inch (0.063 feet) conventional 1/2 inch hot mix asphalt leveling course. After the contractor installs the leveling course, they will install a 1-inch (0.083 feet) of 1/2 -inch asphalt rubber hot mix. The improvements also consist of a single adjustment of water valves and sewer manholes with a new concrete collar. Improvement on C Street from the intersection of North 1st Street to the intersection of North Imperial Avenue consists of micro milling 1/2 -inch (0.004 feet) for the thru lanes of the street and 1-inch within shoulder areas for an approximate width of 47 feet. After micro milling activities have been completed the contractor shall install a 0.5-inch (0.04 feet) conventional 3/8-inch hot mix asphalt leveling course on the thru lanes only. The contractor shall install a 1-inch (0.0833 feet) 1/2 -inch asphalt rubber hot mix. The improvements also consist of the installation of P.C.C. Handicap ramps and double adjustment of water valves and sewer manholes with new concrete collars. Wildcat Drive from the intersection of Highway 86 to the intersection of Western Avenue consists of applying type 2 slurry seal, striping paving markings, and markers. E Street at the intersection of 5th Street consists of installing a raised median island as illustrated in the details. Jennifer Street and Mesquite Avenue consist of the removal and replacement of the existing P.C.C. curb and gutter. Additional Doc Acq Note: Only those firms who have obtained bid documents from the City will be directly provided any addendums that may be issued for this project before the bid opening date. If you are requesting bid documents from the plan rooms you will need to check with the plan rooms for a copy or follow up with the City to obtain a copy. Questions during the bidding process shall be directed to Ms. Ana Gutierrez, via email at agutierrez@brawley-ca.gov, Telephone (760) 587-4320, no later than 5:00 p.m. December 22, 2023. All questions during the bidding process must be directed to Ms. Ana Gutierrez Public Works Analyst, Telephone (760) 587-4320. Requests for bid documents must be directed to Ana Gutierrez, Public Works Analyst via email at agutierrez@brawley-ca.gov.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.