Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

February 8, 2024

April 8, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$548,635.00

Public - City

img_map_placeholder

Multiple Locations, Brawley, CA

8

6

2

Subscribe to View Full Documents

PROJECT DESCRIPTION: The Work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents. The improvements on C Street from the intersection of Western Avenue to the intersection of First Street consist of micro milling 1/2 -inch (0.04 feet) for the thru lanes of the street and 1-inch within shoulder areas for an approximate width of 47 feet after micro milling activities have been completed. The contractor shall install a 0.75-inch (0.06-foot) conventional 1/2 -inch hot mix asphalt leveling course. The Contractor shall then install an approved paving mat. After the installation of the approved paving mat, the contractor shall install a 1-inch (0.08 feet) 1/2 -inch asphalt rubber hot mix. The improvements also consist of the installation of a handicap ramp. The improvements on Steven Street from the intersection of Richard Avenue to the intersection of Evelyn Avenue and Ronald Street from the intersection of Richard Avenue to the intersection of Evelyn Avenue consist of micro-milling 1/2 -inch (0.04 feet) for the thru lanes of the street and 1-inch within shoulder areas for an approximate width of 37 feet. After micro milling activities have been completed the contractor shall install a 0.75-inch (0.06 feet) conventional 1/2 inch hot mix asphalt leveling course. The contractor shall then install an approved paving mat. After the installation of the approved paving mat, the contractor shall then install a 1-inch (0.08 feet) of 1/2 inch asphalt rubber hot mix. The improvements also consist of the installation P.C.C. handicap ramp and sidewalk. Additional Doc Acq Note: Only those firms who have obtained bid documents from the City will be directly provided any addendums that may be issued for this project before the bid opening date. If you are requesting bid documents from the plan rooms you will need to check with the plan rooms for a copy or follow up with the City to obtain a copy. Questions during the bidding process shall be directed to Ms. Ana Gutierrez, via email at agutierrez@brawley-ca.gov, Telephone (760) 587-4320, no later than 5:00 p.m. December 22, 2023.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.