Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 16, 2022

June 15, 2022

September 8, 2022

Multiple Locations

Site Work

No Information to Display

$193,000.00

Public - City

img_map_placeholder

Multiple Locations, Galeton, PA

Subscribe to View Full Documents

The Project includes the following Work: Modifications to piping, new piping, relocation of turbidimeters, new turbidimeters and chlorine analyzers, new flow meters, new motor actuated valves, a precast concrete valve vault, underground piping and valves, controls, electrical power distribution, electrical signal and control wiring, and underground electrical conduit and wiring, and related work. Pre-bid Conference There will not be a pre-bid conference. Each bid must be accompanied by a certified check or bid bond in the amount of ten (10%) percent of the total bid, as a guarantee that the bidder will execute the contract and furnish the necessary bonds if the contract is awarded to him/her. A Performance and Payment Bond, each in the amount of one hundred percent (100%) of the estimated contract price, shall be required from the Successful Bidder. The Galeton Borough Authority reserves the right to waive any irregularities and to reject any and all bids and to award either contract to the lowest responsible bidder for the total of all lump sum items. No bidder may withdraw his or her bid within sixty (60) days after the actual opening thereof. The Work is to be constructed under one contract as follows: Contract 1 Water System Improvements Each bid shall be accompanied by a certified check or bid bond in the amount of 10 percent (10%) of the maximum amount of the bid, as a guarantee that the bidder will execute the contract and furnish the necessary bonds if the contract is awarded to him/her.

114 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.