Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2021

September 29, 2021

January 27, 2022

Mill St

New Construction, Renovation, Site Work

No Information to Display

$469,331.00

Public - City

img_map_placeholder

Mill St, Galeton, PA

Subscribe to View Full Documents

The Galeton Treatment Plant Rehabilitation project consists of the construction the WWTP pumps station, valve vault, control building blowers, blower piping, and blower valves. This project includes the demolition of the existing valve vault for the pump station and bypass pumping influent pump station for construction One General and one Electrical contract will be awarded for this project. A certified check or bank draft payable to the order of Galeton Borough Authority or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to ten percent (10%) of the total of the Bid, shall be submitted with each bid. The Bidder shall include the fully completed Non- Collusion Affidavit with the bid. In addition to the Equal Employment requirements of Executive Order 11246 regarding discrimination, the CONTRACTOR must establish a 6.9% goal for female participation and a 1% goal for minority participation in his/her aggregate on-site construction workforce for contracts in excess of $10,000. The Galeton Borough Authority is utilizing federal funds for this project, and Potter County has adopted a Minority and Women Business Enterprise (MBE/WBE) plan in accordance with Executive Orders 11625, 12138, and 12432 and a Section 3 Action Plan in accordance with Title 24 Part 135 Code of Federal Regulations. As such, the bidders/offerors must submit documentary evidence of minority and women business enterprises and Section 3 business concerns who have been contacted and to whom commitments have been made. Documentation of such solicitations and commitments shall be submitted with the bid. Moreover, the CONTRACTOR shall strive to meet the MBE goal of 5% and the WBE goal of 3% for contracts of $25,000 or more. Goals of 5% for minority business enterprise and 3% for women business enterprise participation The Potter County, in accordance with its Section 3 Action Plan, may provide a bid preference to a bidder who is a Section 3 business concern. MBE/WBE and Section 3 business concerns shall be afforded full opportunity to bid without discrimination. Davis-Bacon and Related Acts apply to this Project. Bids may be held by the Galeton Borough Authority for up to 60 days from the date of opening for the purpose of reviewing the bids and investigating the qualifications of bidders prior to awarding the contract. The Galeton Borough Authority reserves the right to reject any or all bids, to waive any irregularities, or to negotiate contract amounts. Bid Result GENERAL CONSTRUCTION L.C. Whitford Co., Inc. $392,000 ELECTRICAL CONSTRUCTION Dave Kronenwetter $77,331

81 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects