Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 31, 2024
December 2, 2024
February 25, 2026
100 Frank Satterfield Rd
Site Work
No Information to Display
$700,000.00
Public - City
100 Frank Satterfield Rd, Perry, GA
Frank Satterfield WPCP Expansion to 3.6 MG. Each Bid must be accompanied by a Bid Bond or certified cashier's check, in the amount of 10% of the base bid, prepared on the form of Bid Bond, section 00 04 10, attached to the Contract Documents or a Surety Company's Standard Bid Bond, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and listed in the latest issue of U.S. Treasury Circular 570 with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Each Bond shall be accompanied by a "Power of Attorney" empowering the attorney-in-fact to bind the surety and certified to include the date of the bond. Scope of Work The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, testing, startup, and other costs and effort required to complete the following: Installation of a cover on the screenings conveyor Installation of a lime pump Installation of a tank and skid system for chemical phosphorus removal Installation of four additional disks to each of the two filters Installation of UV disinfection basin Converting the existing chlorine contact basin into a post aeration basin with surface aerators. Extension of the existing outfall Updates to the SCADA system Contractor License The Bidder shall affix to the outside of its Bid envelope, its Georgia Utility Contractor License Number, not the license number of a Utility manager or a subcontractor's Georgia Utility Contractor License Number. No bid will be opened unless the Contractor's Utility License Number is affixed to the envelope. All other materials will be provided by the Contractor. The time allotted for substantial completion of the work is 390 consecutive calendar days from the Notice to Proceed, and the time allotted for final completion of work is 450 consecutive calendar days from the Notice to Proceed. Permits Contractor will acquire all necessary Federal, State and local permits preceding the issuance of the Notice to Proceed. The Bidder shall affix to the outside of its Bid envelope, its Georgia Utility Contractor License Number, not the license number of a Utility manager or a subcontractor's Georgia Utility Contractor License Number. No bid will be opened unless the Contractor's Utility License Number is affixed to the envelope. The Owner reserves the right to reject any or all Bids, to waive informalities and to readvertise.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Perry, GA
Bid Date: Oct 18 2024
Perry, GA
Bid Date: Sep 24 2024
Perry, GA
Bid Date: Aug 08 2024
Perry, GA
Bid Date: Nov 18 2021
Perry, GA
Bid Date: Nov 21 2023
Perry, GA
Bid Date: Sep 08 2023
Perry, GA
Bid Date: May 05 2023
Perry, GA
Bid Date: Jul 18 2023
Perry, GA
Bid Date: Jun 22 2023
Savannah, GA
Bid Date: Sep 04 2024
Atlanta, GA
--
Dry Branch, GA
Bid Date: Sep 16 2024
Savannah, GA
Bid Date: Sep 23 2024
Roswell, GA
Bid Date: Nov 07 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
