Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2024

December 2, 2024

February 25, 2026

100 Frank Satterfield Rd

Site Work

No Information to Display

$700,000.00

Public - City

img_map_placeholder

100 Frank Satterfield Rd, Perry, GA

Our team is requesting plans for this project.

Subscribe to View Full Documents

Frank Satterfield WPCP Expansion to 3.6 MG. Each Bid must be accompanied by a Bid Bond or certified cashier's check, in the amount of 10% of the base bid, prepared on the form of Bid Bond, section 00 04 10, attached to the Contract Documents or a Surety Company's Standard Bid Bond, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and listed in the latest issue of U.S. Treasury Circular 570 with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Each Bond shall be accompanied by a "Power of Attorney" empowering the attorney-in-fact to bind the surety and certified to include the date of the bond. Scope of Work The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, testing, startup, and other costs and effort required to complete the following: Installation of a cover on the screenings conveyor Installation of a lime pump Installation of a tank and skid system for chemical phosphorus removal Installation of four additional disks to each of the two filters Installation of UV disinfection basin Converting the existing chlorine contact basin into a post aeration basin with surface aerators. Extension of the existing outfall Updates to the SCADA system Contractor License The Bidder shall affix to the outside of its Bid envelope, its Georgia Utility Contractor License Number, not the license number of a Utility manager or a subcontractor's Georgia Utility Contractor License Number. No bid will be opened unless the Contractor's Utility License Number is affixed to the envelope. All other materials will be provided by the Contractor. The time allotted for substantial completion of the work is 390 consecutive calendar days from the Notice to Proceed, and the time allotted for final completion of work is 450 consecutive calendar days from the Notice to Proceed. Permits Contractor will acquire all necessary Federal, State and local permits preceding the issuance of the Notice to Proceed. The Bidder shall affix to the outside of its Bid envelope, its Georgia Utility Contractor License Number, not the license number of a Utility manager or a subcontractor's Georgia Utility Contractor License Number. No bid will be opened unless the Contractor's Utility License Number is affixed to the envelope. The Owner reserves the right to reject any or all Bids, to waive informalities and to readvertise.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.