Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2024

February 3, 2025

August 4, 2025

Multiple Locations

Site Work

No Information to Display

$1,000,000.00

Public - County

img_map_placeholder

Multiple Locations, Perry, GA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Offeror agrees to furnish all materials and equipment and to perform all labor necessary to install +-11,500 LF of 12'' ductile iron water main, jack and bores, fire hydrants, valves, vaults, fittings, and all related work. Any other questions can be directed to the issuing office, Carter & Sloope, Inc., Canton, GA, 770-479-8782. Notice to Proceed: February 2025 Date of Substantial Completion: August 2025 Award of Contract: November 2024 Preconstruction Conference: January 2025 Proposals shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful offerors if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. Time allotted for completion of Work is 180 consecutive calendar days from the date of a written "Notice to Proceed" from OWNER. Owner reserves the right to reject any or all Proposals, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Proposals and to reject the Proposal of any Offeror if Owner believes that it would not be in the best interest of the Project to make an award to that Offeror, whether because the Proposal is not responsive or the Offeror is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. Owner also reserves the right to issue change orders altering the original scope of work to address changes or unforeseen conditions necessary for the project completion.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.