Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 4, 2024

November 4, 2024

July 25, 2025

To Be Determined

Demolition, New Construction, Paving, Site Work

No Information to Display

$295,000.00

Public - County

img_map_placeholder

To Be Determined, Norwalk, OH

8

6

2

Subscribe to View Full Documents

Document notes: Bidder may elect to have these documents mailed to them for an additional fee of $10.00 for shipping. Bid documents must be obtained from the Huron County Engineer, no copies will be accepted. All bid documents must be submitted bound in their entirety. Each bidder is required to furnish with its proposal a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security furnished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. Each proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. The owner intends and requires that this project be completed no later than July 25, 2025 . Only prequalified contractors are eligible to submit bids for this project. Bidders must be prequalified by the Ohio Department of Transportation (ODOT) in accordance with ODOT's Construction and Material Specifications Section 102. Bidders must comply with the prevailing wage rates as determined by the U.S. Department of Labor under the Davis-Bacon and related Acts. The Board of County Commissioners of Huron County reserves the right to waive any and all irregularities in the bids or bidding process and may reject any and all bids The Contractor shall furnish, at its own cost and expense, all management, labor, tools, forms, equipment, appliances, machinery, transportation, materials and other things necessary, of whatever nature, to perform the Work, and shall perform and complete, within the time limit specified, all of the Work indicated or implied by the including the Notice to Bidders, Instructions to Bidders, General & Supplemental Provisions, Standard Specifications, Scope of Work, Plans & Specifications, and Estimated Quantities prepared for this Project, including the removal of surplus or condemned materials, and the thorough cleaning of the site of the Work and structures built. In no case will any Work, in excess of such requirements, be paid for unless ordered in writing by the County as hereinafter specified. All Work shall be of the best quality throughout. Unless otherwise provided herein, all materials shall be new. 2. SCHEDULE OF PERFORMANCE At the pre-construction meeting, the Contractor must provide the Engineer with a printed schedule showing the interrelation and planned performance of all major items of Work, with completion reasonably scheduled thereon to occur by the scheduled completion date recited herein. The Engineer shall review and consider acceptance of the schedule as provided by section 108.02 (B) (1) of the Standard Specifications

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.