Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

November 24, 2024

690 Valencia Rd

Renovation

No Information to Display

$40,796.00

Public - County

img_map_placeholder

690 Valencia Rd, Mars, PA

24

9

7

4

Subscribe to View Full Documents

The overall project consists generally of the construction of a 9,936 square foot (108x92) single floor pre-engineered steel building for police vehicle storage. General Construction work includes foundation and building shell. The mechanical work includes the installation of four (4) gas heaters, exhaust fans and gas lines as indicated on plan sheets M-1 & M-2. The electrical work includes the installation of interior and exterior lights, and receptacles for the garage area, office, bathroom, and equipment room as indicated on plan sheets E-1, E-2, & E-3. The plumbing work is for water service and sanitary lines which includes floor drains for the main garage and wash bay along with bathroom fixtures as indicated on plan sheets P-1 & P-2. Each contractor will be expected to coordinate with the separate trades (MEPs), the general contractor, and owner. The MEP work is to being competitively bid by the Township due to separation of trade requirements. Site work may be bid separately by the Township after building construction Each bid shall be made on the form provided in the contract documents and shall be accompanied by a bid bond, certified check or cashiers check in a sum equal to ten percent (10%) of the total bid amount made payable to Adams Township furnished by a surety company authorized to do business in the Commonwealth of Pennsylvania The Police Garage General Construction is currently contracted and under construction by W.K. Thomas & Associates, General Contractors with a November 24, 2024, date of substantial completion Adams Township reserves the right to reject any or all bids, to waive informalities, and to award a contract in the best interest of Adams Township

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects