Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 15, 2024

March 1, 2024

August 1, 2024

1100 North Ave

Renovation

No Information to Display

$250,000.00

Public - State/Provincial

img_map_placeholder

1100 North Ave, Grand Junction, CO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe to View Full Documents

Reference Number 0000337957 Job Location: Colorado Mesa University Main Campus 1100 North Avenue Grand Junction, Colorado United States 81501 Anticipated Construction Start/Finish 3/1 - 8/1, 2024 Bid Intent Deadline 01/12/2024 01:00 PM EST Colorado Mesa University (CMU) seeks a qualified CM/GC partner to provide construction management services for the expansion of the campus geothermal system, the integration of the geo-exchange system into the balance of CMU facilities, and the construction of additional interconnected facilities in the planned mixed-use zone of campus currently referred to as the Formation District. The project is expected to be implemented in multiple phases. The construction manager selected through this RFP (Request for Proposals) will collaborate with CMU to develop a phasing plan and subsequently release bid packages for the various scopes of work identified below. These work packages will cover the implementation of either the entire scope or specific parts of the project: Funding is currently available for the following scopes of work: Extend Central Loop to Moss Performing Arts Center, Lowell Heiny Hall, & connect back into main loop at Wubben Science Building Extend Central Loop to New Theater, & connect back into main loop north of Bunting Hall Extend Central Loop to Walnut Ridge Apartments, Pinon Hall, Tolman Hall, Rait Hall, Albers Hall, CMU Admissions & Student Housing Offices Drill new well field on west half of rugby pitch Drill new well field east of CMU Center for Reflection Drill remainder of infield at CMU track complex Drill new field in parking lot CP6 (North of CMU Outdoor Program) Question Acceptance Deadline 01/09/2024 11:00 AM MT Questions are submitted online No, Suzanne Ellinwood, Director of Campus Procurement & Risk Management, at: sellinwo@coloradomesa.edu The State reserves the right to reject any or all proposals on the basis of being unresponsive to this RFP or for failure to disclose requested information.

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects