Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 5, 2025

January 16, 2024

May 31, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Winter Haven, FL

Subscribe to View Full Documents

Logistics Parkway/Pollard Road Roadway Extension Phase II Question Deadline 11/09/2023 at 2:00 PM ET Questions should be emailed to Todd at tgooding@mywinterhaven.com to Todd Gooding at tgooding@mywinterhaven.com. Questions received after this time may not be answered. The complete roadway project consists of two (2) phases. Phase II is solely the portion being bid by this invitation. Phase II will be constructed prior to Phase I with a required completion date of June 2024. Phase II will commence at the terminus of the proposed Phase I, extending north (existing City owned wastewater plant #3). Phase II is to be constructed on a combination of existing, acquired public rights-of-way and City owned land up to an existing CSX crossing. Phase II will be improved roadway construction with stormwater installations. The proposed road is to be two-lane (12' lane width) based on an approved cross-section and current FDOT Roadway Design Standards. EOR and CEI Services are contracted separately. Existing Infrastructure (entire project Phase I/II): o Two existing intersections (north and south end). o Unimproved road running through subject location in various spots. o Approx. 3,200 linear feet of existing 16 inch PVC water main. o Approx. 3,200 linear feet of existing 24 inch PVC reuse water main. o Approx. 3,200 linear feet of existing 24 inch PVC sanitary sewer force main. o Various above-ground appurtenances (valves, fire hydrant assemblies) o Wastewater treatment plant - WWTP#3. o Industrial manufacturing facility near proposed road. o Residential properties along corridor. o Private utilities not limited to: Electric, Cable, Gas

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects