Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

December 20, 2023

February 20, 2026

4421 NE Columbia Blvd

Outdoor Lighting, Paving, Renovation, Site Work

No Information to Display

$1,800,000.00

Public - State/Provincial

img_map_placeholder

4421 NE Columbia Blvd, Portland, OR

Subscribe to View Full Documents

A. Contractor shall perform the Work in strict accordance with the Contract Documents. Contractor shall provide and pay for all supervision, labor, Materials, tools, equipment and machinery, water, electricity, fuel, heat, utilities, transportation, and other facilities and services, except for those specifically identified in the Contract as provided by TriMet, necessary for the proper execution and completion of the Work by its own means and methods. Contractor shall supervise and perform the Work using its best skill and ability. B. If any references have been made in the Specifications to responsibilities of work by crafts and specialty or trade contractors, these references were made for the convenience of preparing the Specifications and are not intended to limit any responsibility of the Contractor to provide a complete installation under this Contract. Whenever such references are made to any trade designation, subcontractor, or specialty contractor, it shall be deemed to mean the Contractor responsible to TriMet for the Work under this Contract. Columbia Bus Base Materials Management Center Repair and Improvements Project The Contractor shall reroof and install awnings at Building 10, as well as pave, regrade, install traffic control lighting, resurface, and repair the loading dock at TriMet's Materials Management Center at the Columbia Bus Base located at 4421 NE Columbia Blvd., Portland, OR 97218. Question Submission Close Date 10/26/2023 1:30 PM PDT If you need more information on this event, please contact: Ian Bethards-Nelson BethardI@TriMet.org Notice of Intent to Award .............................................................................by November 7, 2023 Board of Directors Approval .......................................................................... December 13, 2023 Issue Notice to Proceed ............................................................................by December 20, 2023 Substantial Completion, Building ................................................................. by January 24, 2025 Pre-Final Completion ................................................................................by November 13, 2025 Final Completion ......................................................................................... by February 20, 2026 TriMet's general order of magnitude for this project is estimated to be in the range of $1,400,000.00 to $1,800,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.