Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 22, 2024

February 22, 2024

No Information to Display

10000 Bay Pines Blvd

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

10000 Bay Pines Blvd, Bay Pines, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe to View Full Documents

Contractor shall provide all parts, materials, staffing, services, and supervision to perform preventative maintenance on (10) Trane water cooled chillers, (3) Trane air cooled chillers, (2) glycol chillers and (9) cooling towers. The equipment included in this contract is attached. GENERAL Chemicals Any chemicals or disinfectants used must be registered with the US-EPA for the application. Safety Data Sheets (SDS) must be made available when asked. Work Hours and Requirements Work hours shall be Monday through Friday 7 AM to 430 PM, unless otherwise authorized by the COR. All work shall be coordinated through COR. Contractor shall check in with the Energy Center, Bldg. 100, and COR each time they are on site to complete scheduled work or respond to emergency calls. Contractor shall have a badge when on site. Only one chiller and/or cooling tower in each plant can be down for service at any one time, unless specifically permitted by the COR due to favorable weather conditions. Data/Deliverable Requirements All preventative maintenance is to be done in accordance with the manufacturer's recommendations and technical manuals. All mechanics working on Trane equipment must be factory certified by Trane. Certifications must be submitted with the proposal. Reports shall be submitted to the COR and/or the Assistant Chief, Engineering Service via e-mail after each service or emergency call. Service Requirements Contractor shall be able to respond to emergency calls within two hours of notification by the COR, designee. Technicians must be factory certified technicians by Trane and must be able to complete all programming for repairs and upgrades to the equipment. All questions regarding this RFQ must be in writing and may be sent by email to john.hamilton2@va.gov. Questions must be received no later than Tuesday, December 19, 2023 at 2:00 P.M, EST. No further questions will be accepted after this date and time.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.