Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

November 6, 2023

February 13, 2024

Multiple Locations

Site Work

No Information to Display

$347,529.00

Public - City

img_map_placeholder

Multiple Locations, Santa Barbara, CA

Subscribe to View Full Documents

This Project is located at Lot 2 - Canon Perdido Garage, 914 Chapala St., and Lot 10 - Ortega Garage, 621 Anacapa St., in the City of Santa Barbara, and is described as follows: to repair/replace damaged vehicle impact barriers at certain locations in the Lot 2 and 10 parking structures. Existing loose barrier cables at the interior of the structure via re-tensioning or replacement. The work associated with this project involves only repair/replacement in kind of existing elements that have previously been designed to earlier codes. The Project is also located at Downtown Parking Lot 9 at 25 E. Canon Perdido Street, Santa Barbara, CA, 93101, and is described as follows: to repair top deck cracking via a bonded concrete overlay and structural steel retrofit. Existing carbon fiber strips on the top deck will be removed and replaced with a bonded concrete overlay. Underneath the top deck, a structural retrofit will be installed between bays to prevent future cracking on the top deck. Estimated Cost. The estimated construction cost is $319,000. Time for Final Completion. The Project must be fully completed within 70 working days from the start date set forth in the Notice to Proceed. City anticipates that the Work willbegin on or about November 6, 2023, but the anticipated start date is provided solely for convenience and is neither certain nor binding. Liquidated Damages $1,000/Day Bid Bond 5.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 10/19/2023 10:00 AM (PDT)

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.