Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 21, 2023

September 21, 2023

No Information to Display

6201 Security Blvd

Renovation

No Information to Display

$100,000.00

Public - Federal

img_map_placeholder

6201 Security Blvd, Baltimore, MD

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Procurement for the maintenance of the Perimeter East Building (PEB) Building Automation Control System (BAS). B-1 Work Location: Social Security Administration, Perimeter East Building (PEB), 6201 Security Blvd. Baltimore, Maryland 21235 B-2 Objective: The SSA Headquarters Perimeter East Buildings requires the services of Control Solutions LLC to maintain, repair, and upgrade as needed, SSA's, Perimeter East Building, Niagara 4 based network: Schneider Electric Tridium building automation program and system. The contractor, Control Sources shall perform this work on the building management system's hardware, software, and all related components. B-3 Scope of Work: Control Sources shall furnish all labor, materials, supervision, and engineering to maintain the present Schneider Electric Tridium building management system (BAS). This includes all hardware and software upgrades to the system as needed to keep it up to date with new technologies, to keep the system as sound and efficient as possible. Control Sources shall maintain, repair, replace, or upgrade the three - (3) workstations as needed for proper operation. Their locations are as follows: 1- PEUB Utility Building, U-03 Console Room, 1- PEUB Utility Building Supervisor Office includes one printer, 1- PEB Building Manager Office G-13 includes one printer. Note: All upgrades/ replacement workstations shall include all necessary software, hardware, and tools, to operate on the current Windows environment. The systems may be upgraded to one of the newer Windows software environments, if pre-approved by the Contracting Officer's Representative (COR). In the event of an upgrade or replacement of hardware or software, it shall be new and equal to, or better than the existing equipment or software in service.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.