Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

September 29, 2023

November 15, 2023

16470 Blaine Ave

Renovation

No Information to Display

$150,952.00

Public - County

img_map_placeholder

16470 Blaine Ave, Rosemount, MN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Dakota Woods Dog Park Electric Upgrades For additional information please contact: Dakota County Facilities Management Curt Peterson 651 438 4677 curt.peterson@co.dakota.mn.us Contractor to work with Xcel Energy to supply electric service to Dakota County Dog Park. Make the owner aware of final costs due to the utility company. Install a new 120/240V 100A single phase service off the Southwest corner of the parking lot. Contractor will work with a county representative for exact placement. Wire the new well - installation date is being determined. Replace 6 existing solar parking lot lights with 120v 100W LED fixtures and tie into the new service via astronomical timeclock/photocell. Existing poles and bases should be reused. Supply and install 2 - 25' light poles and 4 - 150W LED heads in the dog run area for even coverage. New concrete bases need to be poured. Tie into new service via astronomical timeclock/photocell - Lights will be on the same cycle as lot lights and should be run of same timeclock/photocell if feasible. Lights should be Gardco ECF-S-32L-1.2A-WW-G2-AR-3-120V-BL-IMR17-TLR07-Finish-HIS-32- H, Dark Bronze color, or similar to be approved by site supervisor. Poles should be similar to parking lot light pole style - square and dark bronze in color. GSOC locates and project management. Mobilization and demobilization. Form and pour concrete bases. All trenching and backfilling and/or directional boring. Include all permits and inspections E. Substantial completion date is November 15, 2023.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.