Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 28, 2023

March 30, 2023

September 13, 2023

To Be Determined

Renovation

No Information to Display

$385,900.00

Public - County

img_map_placeholder

To Be Determined, Rosemount, MN

Subscribe to View Full Documents

Dakota Ridge Renovation The Architect prepares one of the following documents to modify the scope of work. Documents and attachments revising the drawings and specifications will be distributed electronically and the Contractor will be responsible for printing. a. Supplemental Instructions (SI) which are used for no cost changes. b. Proposal Request (PR) to be used for proposed changes that need written approval on cost prior to proceeding. c. Construction Change Directive AIA Document G714 (CCD) which is used when the work must proceed immediately and time and material cost submitted as soon as possible for review by the Architect.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.