Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 16, 2023

October 16, 2023

October 16, 2025

7 Commercial St

Renovation

No Information to Display

$85,000,000.00

Public - City

img_map_placeholder

7 Commercial St, Brockton, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City of Brockton requests Statements of Qualifications for Filed Subcontractors for the prequalification of the Brockton Public Safety Headquarters in Brockton, MA, pursuant to M.G.L. Chapter 149A. Respondents must be DCAMM certified and meet all requirements noted in the RFQ. All questions regarding the RFQ must be submitted in writing to Kevin Sullivan, ksullivan@chacompanies.com by 2:00 PM on Wednesday, August 9, 2023.. Filed Subcontractor categories are: Masonry, Misc. Metals, Waterproofing, Damp-proofing and Caulking, Roofing and Flashing, Metal Windows, Glass and Glazing, Tile, Acoustical Tile, Resilient Floors, Painting, Elevators, Fire Protection, Plumbing, HVAC, and Electrical. The City of Brockton reserves the right to reject any and all submissions, to waive any informality in prequalification, and to accept or reject submissions as determined in the best interests of the City. The proposed Facility will be constructed on a 3.75-acre site on which the existing Keith Center (composed of the Frederic Douglas Academy and the Champion High School) is currently situated. The Keith Center will be demolished and removed, and a new 117,583 gross square foot ("SF") facility will be constructed in its place, along with an adjacent parking structure for a total square footage for the Project of 226,265 SF. The proposed two- and three-story Facility will include a new headquarters for the Fire, Police, Information Technology, and Emergency Response Departments. The Facility will consist of two wings a north wing that will house the Fire Department, and a south wing that will house the Police and Emergency Response Departments. The northernmost portion of the building, which will house the Fire Department living quarters, is two-stories tall and abuts the Apparatus Bay to the south. Program elements in this wing include Operations and Living facilities for the Fire Department. The Main (First) Floor includes space for Fire Department Operations and the Second Floor includes Bunk Rooms, Toilet/Shower Rooms, and a Wellness Center. The central, three-story portion of the north wing of the facility consists primarily of Fire Department Operations Spaces (Offices, Records Storage, Meetings Rooms, and open work areas). The Police and Emergency Response Departments will be located in the two- and three-story south wing of the Facility. This portion of the building has a full basement that exits into the stand-alone Parking Garage (separate project, designed by others) to the west. Program elements in this south wing include the following: Lower Level: General Storage, Locker Rooms, Training Rooms, a Wellness Center, and Mechanical Rooms Main (First) floor: Detention Cells, Dispatch, Meeting Rooms, Offices, and a Sallyport. Second Floor: Evidence Storage, Offices, and Training Rooms. Third Floor: Offices, Conferences and Communications Rooms, and the Emergency Call Center.

65 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.