Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 14, 2023

August 7, 2023

No Information to Display

24 Front St NW

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

24 Front St NW, Coupeville, WA

Subscribe to View Full Documents

The Port of Coupeville requests proposals from firms to procure, install, test, and instruct owners representative for new underground double-wall two compartment fiberglass fuel tank. Work shall include de-commissioning and removal and safe disposal of existing underground fuel tank. POC is Thomas E. Pressler, Pressler Engineering, Inc. (425) 485-3002, email: tpressler@presslereng.com. Questions relating to materials in these Specifications shall be addressed in writing to: Thomas E. Pressler Pressler Engineering, Inc. 22122 20 th Ave SE Suite161 Bothell, WA98021 Phone (425) 485-3002 E-mail: tpressler@presslereng.com If you wish to receive any possible future addendums for this project, please email tpressler@presslereng.com with your name, address, phone, and email address or call (425) 485-3002 to be placed on the plan holders list. All proposals accepted by the Port of Coupeville shall remain valid for a period of 90 calendar days from the date accepted by the Port of Coupeville. The Port of Coupeville has approximate budgeted range of $200,000 to $250,000 for this project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects