Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 6, 2023

September 18, 2023

December 31, 2023

26 Front Street

Site Work

No Information to Display

$851,000.00

Public - City

img_map_placeholder

26 Front Street, Coupeville, WA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Interested contractors and suppliers must contact Kelly LaFave for plans: EM: KDLafave@msn.com PH: (360) 466-8627 The Base Bid Work consists of the removal and disposal of approximately 27 deteriorated timber piles, the removal, disposal and replacement of approximately 300 linear feet of timber pile cap, the repair and jacketing of 23 deteriorated timber piles, shimming the tops of ten (10) existing timber piles, and the installation of eight (8) new steel pipe piles with bolted connections to the pile cap caps. The work also includes the supply and installation of steel hold-downs and splice plates required for the pile cap replacement and pile repairs. Additive Work may include additional pile cap replacement and additional pile repairs with jackets. It is the Port of Coupeville's intention for the Contractor to order the replacement pile cap and pile repair materials, along with the steel pipe piles, as soon as practical so that expiring grant funds can be utilized. The fuel float must remain operational throughout the project and may not be shut down for more than four (4) consecutive calendar days. The proposed shut-down days must be scheduled with the Port of Coupeville no later than September 1, 2023. The project is fully funded by the Port of Coupeville. For informational purposes, the total project cost is estimated to be between $775,000 and $930,000. Award of the Contract shall be based on the lowest, responsive proposal received from qualified bidders, at the Port of Coupeville's sole discretion, and the available budget. All Pre-Proposal questions and requests for clarification must be in writing and sent via e-mail to Mr. Kelly LaFave at KDLaFave@msn.com. Responses to questions will be issued via addenda and forwarded to all registered plans holders via e-mail. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project Plans and Project Manual may be examined, by appointment, at the Port of Coupeville office, 765 Wonn Road, Building E, Jim Davis House, Greenbank, WA (360) 222-3151 or at the office of the Engineer, Marine Structures Engineering, Inc., 1004 - 7th Street, Suite 201 in Anacortes (360) 466-8627. The check or Bid Bond shall be given as a guarantee that the proposer shall execute such contract as may be awarded to it in conformity with its proposal and with the contract documents, and shall provide surety bonds and proof of insurance as required by the contract documents, within ten (10) calendar days after notification of the award of contract. The Port of Coupeville reserves the right to reject any and all proposals or waive any informality in the bidding and to make the award as deemed to be in the best interest of the Port of Coupeville. It is the intent of the Port to begin this project as soon as practical and to issue an Intent to Award within 15 days, however, no proposer shall withdraw his or her proposal for a period of thirty (30) days after the date set for the proposal opening. All Pre-Proposal questions and requests for clarification must be in writing and sent via e-mail to Mr. Kelly LaFave at KDLaFave@msn.com. Responses to questions will be issued via addenda and forwarded to all registered plans holders via e-mail. the total project cost is estimated to be between $775,000 and $930,000. Project Plans and Project Manual may be examined, by appointment, at the Port of Coupeville office, 765 Wonn Road, Building E, Jim Davis House, Greenbank, WA (360) 222-3151 or at the office of the Engineer, Marine Structures Engineering, Inc., 1004 - 7th Street, Suite 201 in Anacortes (360) 466-8627

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.