Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 11, 2025

May 1, 2024

September 30, 2024

Multiple Locations

Renovation, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Zeeland, MI

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Project consists of work at multiple buildings. Lincoln Elementary project involves work related to removal/replacement of select area of the existing asphalt playground. West HS involves work to rehabilitate the existing roofing membrane. The ECC project involves work related to remove/replace the existing parking lot as well as the removal/replacement of two flat roof membrane areas. Athletic Stadium work involves removal/replacement of existing asphalt parking lot and removal/replacement of track surfacing runways and practice track. Each bid shall be accompanied by a good and sufficient bid security or bid bond in an amount not less than 5% of the Bid amount and shall secure the Owner from loss or damage by reason of the withdrawal of the Bid by a Bidder or by failure of the successful Bidder to enter into a Contract with the Owner if his Bid is accepted by the Owner. Bid security may be provided by furnishing a bond from a surety company having a rating of A- or better or certified check. Owen-Ames-Kimball is not responsible for the loss of bid security if provided by certified check. Bid security may be provided by furnishing a bond from a surety company having a rating of A- or better or certified check. Owen-Ames-Kimball is not responsible for the loss of bid security if provided by certified check. BP-9: West HS Roof Rehabilitation, ECC Roofing & Pkg Lot, Stadium Track Surfacing & Pkg Lot, Lincoln Elem Playground Asphalt Replacement Out to Bid: October 10, 2023 Bids Due: October 24, 2023 Construction Start: May 2024 Complete: September 2024

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.