Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 16, 2023

September 15, 2023

No Information to Display

Grover Hollow Rd

Site Work

No Information to Display

$593,718.00

Public - City

img_map_placeholder

Grover Hollow Rd, Genesee, PA

Subscribe to View Full Documents

The work included in this project consists of approximately 1550 LF. of 8' water main and appurtenances along Grover Hollow Road. This work includes installation of a water meter vault, water meter, approximately 12 service sets, 3 gate valves, 2 hydrant assemblies and a connection on each end to existing water main along with other work specified and indicated in the Contract Documents. . Contact the Engineer, Larson Design Group, 1000 Commerce Park Drive, Suite 201, Williamsport, PA 17701, (570) 323-6603 between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. A certified check or bank draft payable to the order of Genesee Township Water Authority, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to ten percent (10%) of the total of the Bid, shall be submitted with each bid. The Bidder shall include the fully completed Non-Collusion Affidavit with the bid. In addition to the Equal Employment requirements of Executive Order 11246 regarding discrimination, the CONTRACTOR must establish a 6.9% goal for female participation and a 1% goal for minority participation in his/her aggregate on-site construction workforce for contracts in excess of $10,000. The GTWA is utilizing federal funds for this project, and Potter County has adopted a Minority and Women Business Enterprise (MBE/WBE) plan in accordance with Executive Orders 11625, 12138, and 12432 and a Section 3 Action Plan in accordance with Title 24 Part 75 Code of Federal Regulations. As such, the bidders/offerors must submit documentary evidence of minority and women business enterprises and Section 3 business concerns who have been contacted and to whom commitments have been made. Documentation of such solicitations and commitments shall be submitted with the bid. Moreover, the CONTRACTOR shall strive to meet the MBE goal of 5% and the WBE goal of 3% for contracts of $25,000 or more. For projects which the amount of HUD or CDBG funding exceeds $200,000 the CONTRACTOR must attempt to meet the minimum numerical goals of which 25% or more of the total number of labor hours worked by all workers on a Section 3 project are Section 3 workers, per 24 CFR Part 75.19; and 5% or more of the total number of labor hours worked by all workers on a Section 3 project are Targeted Section 3 workers, as defined in 24 CFR Part 75.21. Potter County, in accordance with its Section 3 Action Plan, may provide a bid preference to a bidder who is a Section 3 business concern. MBE/WBE and Section 3 business concerns shall be afforded full opportunity to bid without discrimination. DavisBacon and Related Acts apply to this Project. The ENGINEER shall decide questions which may arise as to the quality and acceptability of materials furnished, Work performed, rate of progress of Work, interpretation of Plans and Specifications and all questions as to the acceptable fulfillment of the Contract Agreement on the part of the CONTRACTOR. The duties and responsibilities of the ENGINEER as setforthhereinshallnotbeextendedexceptthrough written consent of the ENGINEER and the OWNER Bids may be held by the GTWA for up to 60 days from the date of opening for the purpose of reviewing the bids and investigating the qualifications of bidders prior to awarding the contract. The GTWA reserves the right to reject any or all bids, to waive any irregularities, or to negotiate contract amounts. In addition to the Equal Employment requirements of Executive Order 11246 regarding discrimination, the CONTRACTOR must establish a 6.9% goal for female participation and a 1% goal for minority participation in his/her aggregate on-site construction workforce for contracts in excess of $10,000. Should you have any questions or concerns, please contact Jason Ryndock, Ecological Information Specialist, by phone (717-705-2822) or via email (c-jryndock@pa.gov).

48 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects