Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 13, 2023

November 13, 2023

No Information to Display

S 48th St W

New Construction, Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

S 48th St W, Billings, MT

Subscribe to View Full Documents

The City of Billings, Burns & McDonnell (Engineer), and Garney (General Contractor/ Construction Manager), invite Bidders to bid on the Construction of the West End Water Treatment Plant (WEWTP) Overall Guaranteed Maximum Price (GMP) Bid Packages. The City has contracted with Garney as the GC/CM. The completed Work will provide the City of Billings with a new West End Water Treatment Plant located south of Hesper Road between Shiloh Road and South 48th Street West. The City intends to award a Construction Contract to Garney based on the 60% Design documents. Subsequently, Garney intends to award contracts to Bidders through Best Value Selection at the 60% Design phase. Contracts will be based on the Work Defined in the contract documents plus Inferred Work as described on the Bid Form. If the Design changes from 60% to 100%, the chosen Bidders will have an opportunity to price the changes. The chosen Bidders shall review the 100% Design Documents and provide Garney a complete and revised estimate showing changes. If Garney agrees that the scope and price is reasonable, a change order will be issued; however, if Garney determines the Bidders change order pricing is unreasonable, Garney can choose to cancel contracts at that time at their sole discretion. Project Schedule to be finalized at a later date: Bid Documents Posted -March 20, 2023 Notice of Award-June 2023 Notice to Proceed-July 2023 90% Bid Documents Available-September 2023 100% Bid Documents Finalized-December 2023 Substantial Completion-Fall 2025 Final Completion-Winter 2025 Bid Packages in the overall GMP include supply and/or installation of Third Party Testing Services, Micropiles, Earthwork, Dewatering, Yard Piping, Process Mechanical, Electrical Subcontractor, Concrete Reinforcement, Cast-in-Place Concrete, Precast Structural Concrete, Structural Steel, Misc Metals, Interior Architectural Woodwork, Fiberglass Reinforced Gratings, Bituminous Damproofing, Penetration Firestopping, Joint Sealants, Hollow Metal Doors and Frames, Overhead Coiling Doors, Floor Access Doors and Frames, Aluminum Windows, Gypsum Board, Ceramic Tiling, Acoustical Tile Ceilings, Protective Coatings, Metal Toilet Compartments, Prefabricated Metal Buildings, Automatic Sprinkler Systems, Plumbing, HVAC, Asphalt Paving, Concrete Paving, Chain Link Fence and Gates, Landscaping, Pipe and Valve Supply, Cranes and Hoists Process Equipment (the Solids Removal Equipment, Horizontal Flocculation Equipment, Inclined Plate Settlers, and Membrane Filtration Equipment have already been awarded in an early package.) Documents provided to bidders: Specifications - Issued for 60% Design Review Dated March 2023 Drawings Issued for 60% Design Review Dated March 2023 Sample of Garney Subcontract Agreement Terms Sample of Garney Purchase Order Terms Prime Agreement between Garney and the City of Billings (available upon request) Request for Bids / Bid Form Garney reserves the right to make an award to other than the lowest-priced Bidder and reserves the right to reject any or all bids and to waive irregularities therein. Site Directions: The project site is South of Hesper Road approximately 1/4 mile east of South 48th Street West. include supply and/or installation of Third Party Testing Services, Micropiles, Earthwork, Dewatering, Yard Piping, Process Mechanical, Electrical Subcontractor, Concrete Reinforcement, Cast-in-Place Concrete, Precast Structural Concrete, Structural Steel, Misc Metals, Interior Architectural Woodwork, Fiberglass Reinforced Gratings, Bituminous Damproofing, Penetration Firestopping, Joint Sealants, Hollow Metal Doors and Frames, Overhead Coiling Doors, Floor Access Doors and Frames, Aluminum Windows, Gypsum Board, Ceramic Tiling, Acoustical Tile Ceilings, Protective Coatings, Metal Toilet Compartments, Prefabricated Metal Buildings, Automatic Sprinkler Systems, Plumbing, HVAC, Asphalt Paving, Concrete Paving, Chain Link Fence and Gates, Landscaping, Pipe and Valve Supply, Cranes and Hoists Process Equipment (the Solids Removal Equipment, Horizontal Flocculation Equipment, Inclined Plate Settlers, and Membrane Filtration Equipment have already been awarded in an early package.)

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.