Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

December 25, 2023

June 7, 2025

Disbrow Rd

New Construction, Site Work

No Information to Display

$7,930,125.00

Public - City

img_map_placeholder

Disbrow Rd, Aberdeen, NJ

20

35

2

3

Subscribe to View Full Documents

As of 1/9/24, this project has not yet been awarded. A timeline for award has not yet been established. The project generally consists of the construction of a new 1,000,000-gallon elevated water storage tank. The work will also include the connection of the tank to the distribution system, site improvements, installation of tank inlet line, outlet line, overflow line, miscellaneous piping, and other associated work as contained in the Contract Documents or as ordered by the Engineer. TIME FOR COMPLETION of this Contract is 530 calendar days. Questions regarding the Bid Documents shall not be submitted to the E-mail address listed above as they will not be considered for review bids@cmeusa1.com The successful Bidder shall be required to comply with the provisions of the New Jersey Prevailing Wage Act, Chapter 150 of the Laws of 1963, effective January 1, 1964. Unless otherwise provided in the Supplementary Conditions, Contractor shall obtain and pay for all construction permits and licenses. Owner shall assist Contractor, when necessary, in obtaining such permits and licenses. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER $500.00 for each day that expires after the time specified in paragraph D 3.1 for Substantial Completion until the Work is substantially complete. The Authority reserves the right to reject any, or all Bids if in its opinion it is in the best interest to do so and to award the Contract for any and/or all items.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.