Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

July 8, 2024

October 21, 2024

S Mason Rd

Paving, Site Work

No Information to Display

$2,000,000.00

Public - County

img_map_placeholder

S Mason Rd, Saint Louis, MO

Subscribe to View Full Documents

Location: Mason Road from Mason Ridge Road to Clayton Road Proposed Improvement: Resurfacing, convert 5' sidewalk to an 8' shared use path, and signal Replacement at Clayton Road. All questions must be submitted by 5:00 p.m. on August 23, 2023 via e-mail to the Contract Administrator, Shandrika Combs Approximate Construction Cost: $1M-$2M Length: .0.6 mile This project includes the following major scope elements: x Resurfacing x ADA improvements x Traffic Signal Replacement at Mason Road and Clayton Road x Construction of a multi-use trail on the west side of Mason Road from Mason Ridge Road to Clayton Road. Specific consultant scope items include: x Section 106 Documentation and Application x Threatened and Endangered Species Documentation and Application x Preliminary Plans x Right-of-Way Plans x Final Plans x Job Special Provisions x Construction Estimates x Coordination with the Missouri Department of Transportation (MoDOT) x Coordination with the City of Town and Country x Pavement Borings and Design (if necessary) x Utility Coordination (if necessary) x Miscellaneous Pick-Up Survey Work (as necessary) x Roadway, Sidewalk, and Shared Use Path Design x Striping Plan x Traffic Signal Modification Design x Retaining Wall Design (if necessary) x Culvert Design (if necessary) x Geotechnical Investigation (if necessary) x Subsurface Utility Investigation (if necessary) x Drainage Structure Design (if necessary) x Water Quality Design (if necessary) Questions regarding this solicitation shall be submitted in writing to the project contact above no later than 9:00 am on June 9, 2020. Failure to comply with the requirements of the RFQ may negatively impact the evaluation of the consultant's Statement of Qualifications. The method of contractor selection has not been determined at this time.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.