Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 25, 2019

July 5, 2019

November 1, 2019

Multiple Locations

Paving, Site Work

No Information to Display

$115,385.00

Public - City

img_map_placeholder

Multiple Locations, Laconia, NH

11

3

2

Subscribe to View Full Documents

**As of June 5, 2019, the project was awarded to Raymond's Landscaping LLC for $115,385.70. The project will start as soon as possible and should be completed on November 1, 2019.** The City of Laconia Parks and Recreation Department is seeking bids from qualified firms capable of providing services related to the installation of additional stormwater conveyance, erosion control measures, additional parking and landscaping improvements to Bond Beach in accordance with, and as detailed in, the plans (50LN7.02) developed by Loureiro Engineering Associates dated 9/24/18. The project area consists of a portion of the property located at 478 Elm Street that is owned bythe City of Laconia and the Elm Street School (Parcel No. 321-71-1). The project area is located on the southern portion of this property along the Opechee Bay shoreline and is known as Bond Beach. Presently, storm water runoff in the immediate vicinity is captured in a series of swales that convey runoff north to south along the beach and discharges into Opechee Bay. Some storm water runoff from the parking lot is not captured by these swales and is causing erosion that is creating rills and wasting of the beach. This work proposes 1) to install additional storm water conveyance to capture storm water runoff from the parking area, and 2) to install erosion control measures to protect the sand beach area from washing out, and 3) to expand the existing parking area and make landscaping improvements to the Site.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.