Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 22, 2024

November 13, 2024

No Information to Display

Tomkins St

Paving, Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

Tomkins St, Melbourne, FL

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

This project consists of the removal of the existing curbing and full depth pavement for a portion of Tomkins Street. That portion is to be reconstructed with concrete drop curb, concrete valley gutters across roadway intersections, and full depth black base pavement. The remaining pavement within the subdivisions is proposed to be either fully relaced with black base pavement or mill and resurfaced depending on the condition of the existing pavement. Several existing curb and gutter segments within the subdivision were modified with concrete ramping which obstructs the gutter flow of stormwater. Curbing removal and proposed curb transitions to drop curb is proposed for these locations. Concrete driveways apron adjacent to these locations are proposed to be removed from back of curb to sidewalk and reconstructed to match the proposed drop curb elevation. Deadline for Questions October 8, 2024 Contract Award November 12, 2024 Pre-Construction Meeting December 4, 2024 at 11:00 am The work includes furnishing all material, labor, and equipment necessary for constructing BOWE GARDENS K1/K2 RESURFACE AND RESTORATION. All work is to be done in accordance to the plans and specifications of Project No. 64619. All questions about the meaning or intent of this Invitation to Bid must be submitted in writing at least fourteen (14) calendar days prior to bid due date. All questions must be directed to the City of Melbourne, 900 E. Strawbridge Avenue, Melbourne, FL 32901, Attention: Kacie Black, Engineering Department, Kacie.black@mlbfl.org. Only questions answered by formal written addenda will be binding. Oral and other interpretations or clarifications will be without legal effect and shall not be relied upon by Bidders in submitting their bids. The Contractor shall not subcontract more than 50% of the work based on the total contract price. Applicant may not utilize subcontractors for the role of project manager. The successful bidder must be a licensed General Contractor and/or Underground Utility Contractor and must be able to show a past history of successfully completed Underground Utility Projects that are compliant with the applicable permits and standards. Contractor, or its sub-contractor(s), shall possess and maintain during the term of this Agreement one of the following licenses and/or certifications: 1. Florida Registered or Certified General Contractor 2. Florida Registered or Certified Underground Utilities Contractor Bids must be accompanied by a cashier's check or bid bond in an amount not less than five percent of the bid. Bid bonds shall be countersigned by an agent having an established place of business in the State of Florida. No bid may be withdrawn for a period of 55 days after scheduled closing time for receipt of bids. Bidders must include one original and one copy of their submitted bid. The City of Melbourne, Florida, reserves the right to reject any and all bids, and to waive technicalities and informalities.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.