Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2024

November 4, 2024

No Information to Display

46555 Michigan Ave

Site Work

No Information to Display

$20,000.00

Public - City

img_map_placeholder

46555 Michigan Ave, Canton, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Reference Number 0000363384 Any questions concerning the conditions or specifications shall be directed to the designated contact person. Addenda items will be posted on the township website, on the Purchasing Division page under Requests for Bids, Proposals and Qualifications. It is the bidders responsibility to check and verify that addenda have been issued. Failure to acknowledge addenda may result in the offer not being considered. Monument Sign Refresh & Upgrade PROJECT SCHEDULE Work can commence immediately once the timeline is approved by the Project & Facilities Service Manager. SPECIFICATION o Replacing 3 of 5 of the existing sign panels on each side o "Canton Sports Center" o Kickers Grill with new artwork o 46245-46615 o Provide alternative pricing to replace "High Velocity" and "Arctic Edge" panels o Upgrade internal lighting to LED o Power wash, chemical treat and seal to prevent water staining and protect finish. o Offer alternate pricing for painting sign with color matched paint and providing protective finish. o All equipment and rentals must be included in your bid/proposal. o Contractor to be responsible for all demolition and disposal costs. o Contractor must provide all necessary means of safety precautions, including barriers, signage, etc., and must communicate with the Project & Facilities Service Manager a minimum of 48 hours prior to construction. o Contractor is responsible for any restorations required to project site. o All schedules must be approved by the Township Project Manager o Any deviation from these specifications must be approved in writing by Canton Township. Permits for the job are required. Township permit fee will be waived (any reinspection cost is not). All final inspections are required for final payment. Contractor may invoice up to 90% at completion of work while waiting for final inspection.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.