Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 2, 2024

May 1, 2025

No Information to Display

N Milwaukee Ave

Site Work

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

N Milwaukee Ave, Niles, IL

7

9

2

Subscribe to View Full Documents

Milwaukee Avenue Water Main Lining Design Build Nothing herein is intended to exclude any responsible firm, or in any way restrain, or restrict competition. All responsible and eligible firms are encouraged to submit proposals. The Village of Niles reserves the right to accept or reject any or all proposals, to waive informalities or technicalities in any proposal, and to accept the proposal which it deems to be in the best interests of the Village. Question Deadline 09/25/2024 All questions to be emailed to Susan Bus, Purchasing Agent at slb@vniles.com five days prior to due date to allow sufficient time for a written response. There are two primary services required for this Project: 1. Watermain lining design, permitting, and preconstruction services 2. Watermain lining construction and construction management The respondent must submit a team covering all portions of the scope of work. 1) Watermain Lining Improvement Design, Permitting and Preconstruction services The watermain rehabilitation design shall meet the following performance specifications: a. Design or performance specifications for temporary bypass systems including functionality for customer water metering. b. Cured in Place Pipe (CIPP) Lining AWWA Class IV for 16" diameter with water services reestablish via robot or other trenchless technology. CIPP Lined pipe to be pressure tested per ASTM F1216-16-18.3. c. Water system disinfection in accordance with AWWA and IEPA standards. d. Replace all gate valves and perform vault repair or replacement in accordance with Village standards. e. Replace all hydrants with Village standard hydrants. f. Perform existing C factor test to determine existing flow conditions. Perform post project C factor test to document flow capacity to match or improve over existing

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.