Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 15, 2024

November 14, 2024

February 12, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$454,671.00

Public - City

img_map_placeholder

Multiple Locations, Simi Valley, CA

7

6

2

Subscribe to View Full Documents

At which time they will be publicly opened. Bids will not be accepted after that time. All bids must be sealed and submitted to the following: City Clerk/District Secretary City of Simi Valley 2929 Tapo Canyon Road Simi Valley, CA 93063 All contacts should be through Rob Herr, Assistant Engineer at (805) 583-6871 or rherr@simivalley.org regarding any bidding questions before or after the Notice to Proceed has been issued to the successful bidder. As described in the Bidding Documents, the bids are for a public works project, Waterline Replacement Project: Cedar Street, Wisteria Street, Rowell Avenue, & Leota Lane, ("Project"), which consists of: 1) mobilization, demobilization, and final clean-up; 2) traffic control, construction signage, and traffic maintenance; 3) constructing 713 linear feet of 6-inch polyvinyl chloride waterline; 4) constructing 115 linear feet of 8-inch polyvinyl chloride waterline; 5) three (3) 6" gate valve installations; 6) four (4) 8" gate valve installations; 7) three (3) air-vac installations; 8) one (1) blow-off installation; 9) 19 water service line replacements; 10) hydrostatic testing and disinfection of domestic water mains and services; 11) highlining water systems; 12) masonry retaining wall construction; 13) 70 square feet of additional roadway replacement; 14) 10 trees trimming; 15) 10 additional potholing for utilities; 16) 50 hours of utility conflict resolution; 17) additional worksite remediation; and 18) all appurtenant work. The waterline is located in the public roadway and as such, coordination with property owner/residents, County Encroachment Permit, and a City Encroachment Permit is required. The expected completion time of the Project is 90 calendar days after receipt of the Notice to Proceed. The Bid shall be submitted and the work shall be performed by a State of California Class A licensed contractor in strict conformance with Specification No. SV 24-10, and now on file in the City's Department of Public Works and the Office of the City Clerk.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects