Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

No Information to Display

To Be Determined

Remodeling, Renovation

No Information to Display

$500,000.00

Public - Federal

img_map_placeholder

To Be Determined, Sheppard AFB, TX

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Project Description: The work to be performed under this contract shall be executed as Design- Build in accordance with these contract documents consists of furnishing all necessary equipment, labor, materials, and incidental related work; for designing, coordinating, constructing, installing, testing, and preforming all work shown and described in the contract documents. Contract drawings (concept) being provide to the contractor have been developed to a 35% level of completion and are to be advanced by subsequent submittals by the design build contractor to a 65%, 95% and 100% level of completion for construction according to the submittal requirements and submittal schedule described here-in, demolishing existing sections of HVAC in this facility that are past service life and require replacement. The work includes: The work includes repair/replacement of select HVAC system chiller, pumps, and humidifiers. 1. Replace Existing Chilled Water Pumps, CHWP-1 &2 2. Replace Existing Heating Hot Water Pumps, HHWP-1 & 2 3. Replace existing humidifier and associated steam piping and dispersion tube. But not limited to please review the specifications for more information. Prevailing Wages Apply. Contract duration = 150 calendar days

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.