Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 2, 2024

January 1, 2025

No Information to Display

235 S Beretania St.

Renovation

No Information to Display

$400,000.00

Public - State/Provincial

img_map_placeholder

235 S Beretania St., Honolulu, HI

5

7

Subscribe to View Full Documents

Remove existing decorative drop ceiling to structural ceiling. Paint new ceiling volume black. Replace the first-floor lobby ceiling and associated light fixtures at the State Office Tower (Also known as the Leiopapa A Kamehameha Building), at 235 South Beretania St., Honolulu, HI 96813 Provide new lighting fixtures and associated wiring to existing switches. Removal and disposal of existing termite damaged false ceiling over the first-floor entry lobby as indicated on sheet E-1. Paint newly exposed ceiling volume space Black as indicated on plan Sheet E-2. Provide new light fixtures as indicated on plan Sheet E-3. Paint Fire Protection system conduit and water piping Red The State Office Tower (also known as the Leiopapa A Kamehameha Building) first floor entry lobby false ceiling has been found to be damaged in multiple areas by termites and requires removal. The existing false ceiling will be removed to the existing structural ceiling. All existing HVAC, Power Distribution, and Fire Protection and other systems components will remain with existing functionality. This newly exposed ceiling volume is to be painted black. Since the lobby lighting is supported by the existing false ceiling, new lighting fixtures are required in this area. This project shall include procurement and installation of new suspended lobby light fixtures. Additionally, fire protection conduits and sprinkler piping shall be painted red to ensure its ready identification. Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility of this Solicitation (Including the appendices and exhibits to this Document, and any other document related to this Solicitation), to: Park, Dixon J.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects