Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 7, 2024

November 6, 2024

December 31, 2025

To Be Determined

Demolition, New Construction, Paving, Site Work

No Information to Display

$1,000,000.00

Public - Federal

img_map_placeholder

To Be Determined, Driggs, ID

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

24SEP2024 - Pre-Bid Site Visit scheduled for 10 a.m. Mountain Time on 30 September 2024. Meet COR Jonathan Wheeler at the Sheep Bridge Trailhead located at https://maps.app.goo.gl/vhkGxxokMkmbq64W8. From there, you all will drive on a convoy a few miles up the road to visit the Treasure Lake Bridge location. Please email Jonathan Wheeler at jonathan.wheeler2@usda.gov no later than this Friday, 27 Sep, to let him know that your firm will be attending this Site Visit. Jonathan's tel # is 208-541-1114. 12SEP2024 - RFP 1240LT24R0072 is posted herein. This procurement is for the replacement of a bridge at Teton Canyon, Caribou-Targhee National Forest in Idaho. Attachments 2 - FSSS and 3 - Bridge Photos will be forthcoming. Proposals are due to mary.hardingusda.gov no later than 5:00 p.m. Central Time on 24 September 2024. MAGNITUDE OF CONSTRUCTION PROJECT - Between $500,000 and $1,000,000 TETON CANYON BRIDGE REPLACEMENT CONSTRUCTION, CARIBOU-TARGHEE NATIONAL FOREST, IDAHO (GAOA) This is a 100% Small Business Set-Aside procurement. The Lowest Price Technically Acceptable (LPTA) proposal evaluation procedures pursuant to FAR 15.101-2 and 13.003(g)(1), shall be utilized to evaluate proposals. There will not be an organized Site Visit prior to proposal due date and time. Prospective offerors are highly encouraged to visit the site to better understand the technical requirements of this construction project. NAICS Code: 237310 PSC: Y1LB The contractor awardee will be required to submit both a Performance Bond and a Payment Bond within ten (10) days after receipt of the Notice to Proceed (NTP) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PROJECT LOCATION Teton Canyon, Caribou-Targhee National Forest, Driggs and Teton Basic Ranger Districts, Idaho

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.