Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
January 24, 2025
No Information to Display
Multiple Locations
Paving, Site Work
No Information to Display
$400,000.00
Public - City
Multiple Locations, Avery, ID
We’ve obtained documents for this project and are currently processing them.
East Fork Ninemile Creek Waste Consolidation Area - Phase 3 Final Cover Project. Scope The work will involve installation of the final cover system of the EFNM WCA to isolate previously place mine waste from the basin. The majority of the work will be located in steep and remote mountainous terrain. Activities include, but are not limited to, the following: Access road maintenance. Erosion control best management practice (BMP) installation and maintenance. Clearing, grubbing, and log and root wad salvage and stockpiling. Drainage control features (i.e., channels, benches, swales) installation. Quarry development (and closure), which includes blasting and processing blasted rock to create specific construction materials. Development and implementation of an Environmental Protection Plan with activities that include: stormwater management, decontamination procedures, site winterization, and housekeeping. Installation of 3 layer liner system consisting of a Geotextile, textured Geomembrane, and Geocomposite Drainage layers. Installation of liner cover system consisting of 1-inch minus material, salvaged soil and lime-amended cover soil. Amend final cover system with Proganics BSM and Richlawn Fertilizer Installation of quarry access road. Permanent seed on the final cover system. Performing quantity and as-built surveys. Implementing a robust quality assurance project plan for certifying materials generated in the quarry are clean. Preparing as-build record drawings, and preparing documentation and reporting to meet the Coeur d'Alene Trust and the EPA requirements.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Avery, ID
Bid Date: Sep 26 2024
Culdesac, ID
Bid Date: Oct 08 2024
McCall, ID
Bid Date: Sep 27 2024
Elk City, ID
Bid Date: Jul 19 2024
Lewiston, ID
Bid Date: Sep 30 2024
Garden City, ID
Bid Date: Oct 07 2024
Harvard, ID
Bid Date: Oct 08 2024
Grangeville, ID
Bid Date: Oct 08 2024
Moscow, ID
Bid Date: Oct 15 2024
Payette, ID
Bid Date: Oct 09 2024
Moscow, ID
Bid Date: Oct 17 2024
Mountain Home AFB, ID
--
Idaho Falls, ID
--
Blackfoot, ID
Bid Date: Jan 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
