Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2024

November 18, 2024

January 2, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

Multiple Locations, Livingston, AL

41

11

3

Subscribe to View Full Documents

Plans and specifications are for viewing purposes only and in order to be considered an official bidder contractors must obtain plans and specifications from Goodwyn Mills & Cawood Inc. Please also fill out the order form in the ITB and email that form to the GMC contact Resurfacing and Widening Along Prystup Dr. N. Ind. Park Rd. Ind. St. & Bennett Rd. (Cr-13) to Benefit Project Livingston. A Cashier's Check (Drawn on an Alabama Bank) or Bid Bond for 5% of the Amount Bid (Maximum of $10,000.00) and Made Payable to the City of Livingston Must Accompany Each Bid as Evidence of Good Faith. In Accordance With Section 34-8-8. Code of Alabama as Amended, "all Owners, Architects, and Engineers Receiving Bids Pursuant to This Chapter Shall Require the Person, Firm or Corporation to Include His or Her Current License Number on the Bid." It Also States That, "it Will Be Necessary for Him or Her to Show Evidence of License Before His or Her Bid is Considered. Prequalification is Not Required on This Proejct. Further Details and Definitions Regarding This Provision Are Included in Section 102 of Special Provision 22-lpa-001 and Aldot's Standard Specifications. Proof of Insurance Coverages of the Types and Amounts as Set Forth in the Project Specifications Will Be Required of the Contractor, and Any and All Subcontractors, Prior to Beginning Work. The Contractor Will Be Required to Perform Work Amounting to at Least 30% of the Total Contract Cost With His Own Organization. This is a State-funded Project Through Aldot. The Proposed Work Shall Be Performed in Conformity With All Applicable Laws, Rules, and Regulations. The Right to Reject Any or All Bids is Reserved. This Bracket Range is Shown Only to Provide General Financial Information to Contractors and Bonding Companies Concerning the Project's Complexity and Size. This Bracket Should Not Be Used in Preparing a Bid, Nor Will This Bracket Have Any Bearing on the Decision to Award the Contract. The Principal Items of Work Are Approximately as Follows: Resurfacing and Widening of Prystup Drive, Industrial Park Road, Industrial Street and Bennett Road (Cr-13) the Entire Project Shall Be Completed in Thirty (30) Working Days. Resurfacing and Widening of Prystup Drive, Industrial Park Road, Industrial Street and Bennett Road (Cr-13) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimate on This Project is From $300,000 to $400,000. Document notes. Said Cost Represents the Cost of Printing, Reproduction, Handling and Distribution; Therefore, No Refund Will Be Granted. Checks Shall Be Made Payable to Gmc. Bid Documents Will Be Mailed Only Upon Receipt of Deposit. No Bid Documents Will Be Distributed Later Than 24 Hours Prior to the Scheduled Opening of Bids.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects