Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 20, 2023

May 18, 2024

100 US-11

Renovation

No Information to Display

$500,000.00

Public - State/Provincial

img_map_placeholder

100 US-11, Livingston, AL

Subscribe to View Full Documents

Project Scope of Work to include following: 1. Providing all labor, equipment and materials as required for the integration of existing Simplex fire alarm systems in the majority of buildings onto the campus-wide single mode fiber optic system. 2. Some buildings require the upgrade of existing antiquated Simplex fire alarm control panels to new Simplex fire alarm control panels with new single mode fiber optic interface. 3. Various buildings require the upgrade of existing communication cards in existing Simplex fire alarm control panels to interface with campus-wide single mode fiber optic network. 4. Provide all head-end integration as required for a complete and operational campus-wide Simplex fire alarm system on single mode fiber optic network. Performance Time: 180 calendar days from date established in writing as the Notice to Proceed. A cashier's check or bid bond payable to University of West Alabama in an amount of not less than five (5) percent of the amount of the bid, but in no event more than $10,000.00 must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interests of the Owner will thereby be promoted. Mr. Ken Tucker President University of West Alabama Livingston, Alabama 35470 (Local Awarding Authority) Mr. Adam Mills, P.E., RCDD Mills-Conoly Engineering, P.C. Any special qualifications required of general contractors, subcontractors, material suppliers, or fabricators are set forth in the Bid Documents. The Awarding Authority may have elected to prequalify bidders. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 200k-500k

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects