Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2024

December 9, 2024

February 28, 2025

1529 W Sequim Bay Rd

Site Work

No Information to Display

$2,510,000.00

Public - Federal

img_map_placeholder

1529 W Sequim Bay Rd, Sequim, WA

45

27

2

Subscribe to View Full Documents

Location: Sequim, WA Country: United States Contracts Specialist: Moore, Gregory S Phone: 509/371-7154 NAICS Code: 236220 (Commercial & Institutional Building Construction) Restriction: None Contract Type: Firm Fixed Price Basis of Award: Sealed Bid: Lowest Price, Technically Acceptable meeting the mandatory criteria stated below. Prime Contractor shall be pre-qualified prior to submitting bid; likewise, Subcontractors to a Prime Contractor performing work shall be prequalified prior to issuance of the NTP. Note - An Experience Modification Rate (EMR) of less than or equal to 0.9 for Prime Contractor (1.0 for Subcontractors) and no willful OSHA/State Labor & Industries Citations over the past three years is needed to meet the pre-qualification requirement. To apply for pre-qualification. Duration/Completion: Estimated Project Complete ready for use, No Later Than, February 28, 2025. Contracts Specialist: Name: Gregory S. Moore Office Phone: 509-371-7154 Email Address: gregory.moore@pnnl.gov 1. SYNOPSIS The Work consists of, but is not limited to, dock and pier upgrades, shoreline and boat launch upgrades, and construction of engineering work space. This above Summary of Work is not all inclusive of the requirements set forth under the terms of the Contract. Contractor shall refer to the Specification and Drawings issued which depict the Work in detail. 2. INQUIRIES & SUBMISSION OF BIDS 2.1. All inquiries shall be submitted in writing by email. 2.2. Bids and modifications shall be submitted by email. 2.3. Bids shall contain the following completed documents: o Solicitation, Offer & Award Form o Representations & Certifications o Construction Pricing Form o Summary construction schedule that demonstrates the ability to meet the project completion date and overall project sequence. o Technical narrative providing a high-level overview of Contractor's approach to executing the work scope. o Proof of Certificate of Liability Insurance o Copy of Bidder's Washington State Contractor's License o Bid Bond o Prime contractor and all subcontractors must flow down all Davis-Bacon requirements and provide documentation. Davis-Bacon reporting is required. 2.4. Failure to submit all of the above required documents with your bid may cause your bid to be determined non-responsive and removed from consideration for award. 3.2. Inquiries: All inquiries must be sent to: gregory.moore@pnnl.gov 3.3. Requests for Clarification / Interpretation: If the Bidder finds discrepancies, omissions, or is in doubt as to the true meaning of any part of the contract documents, Bidder MUST submit a WRITTEN request for clarification or interpretation using Request for Information (RFI) form at website and address it to the Contract Specialist listed on Page 1, no later than 12:00 p.m. PDT; October 3, 2024. Submittals may not be considered if submitted after this time.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.