Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 2, 2024

November 1, 2024

No Information to Display

100 Corthell Ave

Demolition, New Construction, Paving, Site Work

No Information to Display

$41,500,000.00

Public - City

img_map_placeholder

100 Corthell Ave, Whitman, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe to View Full Documents

Request for Qualifications (RFQ) and invites qualified and experienced General Contractors and Filed Sub-Bid Contractors to submit a Statement of Qualifications (SOQ) to prequalify for the building of the new Whitman Middle School at 100 Corthell Avenue, Whitman, MA. The Filed Sub-Bid categories the Town is requiring to prequalify are: Masonry, Misc Metals, Waterproofing, Roofing, Metal Windows, Glass & Glazing, Tile, Acoustical Tile, Resilient Floors, Painting, Elevators, Fire Protection, Plumbing, HVAC and Electrical. Project Description: New construction project will be completed in 2 main phases, construction of the new building in phase 1 and demolition and site work in phase 2. The new Whitman Middle School will be located adjacent to the existing school in the current field. The new school will be 138,605 GSF and will hold 675 students grades 5 through 8. Demolition of the old school and sitework will follow once students and faculty have moved into the new school. The Whitman Middle School consists of classrooms, offices, science labs, gymnasium, cafeteria, auditorium, media center, art and music rooms, and technology rooms. The new school consists of one 3-story building. The project also includes a new parking lot, landscaping, utilities, play fields and playground area. Proposers shall examine all information and materials contained in and with this solicitation. Failure to do so shall be at the proposer's risk. The Town of Whitman reserves the right to waive any informalities or irregularities in the proposals received, or to reject any and all proposals, wholly or in part.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.