Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

October 28, 2024

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Pasadena, CA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Refer to the Specifications for complete details and bidding requirements. The Specification and this Notice shall be considered a part of any contract made pursuant thereunder. All bid pricing must be entered into the City's eProcurement Portal or the bid may be considered informal and deemed non-responsive, do not use a separate document attachment to represent your pricing. All required attachments must be completed and uploaded electronically into City's eProcurement Portal prior to the set bid date and time in this Notice Inviting Bids. DEPARTMENT: Public Works Department, Engineering RELEASE DATE: Thursday, September 5, 2024 CONTACT: Yannie Wu-Bowman The City of Pasadena is seeking the services of a contractor to provide both recurring and on-call services to remove, relocate, and re-install concrete K-rails and TL2 Sleds that the City is using for on-street dining areas. As part of the services contract, the selected contractor shall remove and transport certain K-rail and TL2 Sleds located along the New Year's Rose Parade Route. The selected contractor will drop off the equipment at a determined City facility. After the Rose Parade, the contractor will re-install the K-rail and TL2 Sleds at the previous locations. In addition to the annual services around New Year's Day, the contractor will be on-call to relocate, remove, and/or install any K-rail and TL2 Sleds as needed. The contractor shall be responsible for providing all traffic control services or contracts with a traffic control company as required to perform any and all services rendered as part of this contract. The service contract will be for five (5) years. 2.2. Contact Information Yannie Wu-Bowman Principal Engineer Email: ywu-bowman@cityofpasadena.net Phone: (626) 744-3762 Department: Public Works Department, Engineering

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.