Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2024

December 10, 2024

December 6, 2028

VT-12

Site Work

No Information to Display

$25,000,000.00

Public - State/Provincial

img_map_placeholder

VT-12, Elmore, VT

36

6

6

Subscribe to View Full Documents

Elmore Bf 0241(55) - Vt Route 12, Bridge 94, Approximately 5.6 Miles South of the Junction With Vt Route 15a, in the Town of Elmore. Elmore Stp Culv(64) - Vt Route 12, Bridge 90, Approximately 11.0 Miles South of the Junction With Vt Route 15a, in the Town of Elmore. Worcester Bf 0241(56) - Vt Route 12, Bridge 87 Over Hardwood Brook, Approximately 4.5 Miles North of the Junction With Calais Road in the Town of Worcester. Worcester Bf 0241(57) - Vt Route 12, Bridge 89, Approximately 5.3 Miles North of the Junction With Calais Road in the Town of Worcester Type of Construction: Elmore Bf 0241(55) - Existing Culvert Replacement With a Four-sided Precast Concrete Box Culvert With Associated Roadway Improvements. Elmore Stp Culv(64) - Existing Culvert Replacement With Steel Girder Bridge With Associated Roadway Improvements. Worcester Bf 0241(56) - Existing Culvert Replacement With a Four-sided Precast Concrete Box Culvert With Associated Roadway Improvements. Worcester Bf 0241(57) - Existing Culvert Replacement With Steel Girder Bridge With Associated Roadway Improvements This Contract shall be completed on or before October 23, 2026 For this proposal the Engineer's Estimate is Category G 10,000,000 - $25,000,000 Questions: During the Advertisement Period, All Questions Shall Be Addressed Solely to the Office of Contract Administration via Email: Aot.constructioncontractinginquiry@vermont.gov. All Inquiries Must Be Received by 4:30pm on Wednesday, September 18, 2024. Prequalification of Contractors: All Bidders on This Project Must Hold Both Current Annual Prequalification With the Vermont Agency of Transportation Through the "Contractor's Experience Questionnaire and Financial Statement" And Unconditioned Project-specific Approval Through the "Standard Form - Request for Proposal" Ca-82 Form The estimates of quantities are not guaranteed, but are given as a basis for the comparison of bids. The right is reserved to reject any or all bids, to waive any formality, and any and all technicalities in bids, and to accept such bids as may be deemed in the best interest of the awarding agency VTDOT: Elmore BF 0241(55) & Elmore STP CULV(64) & Worcester BF 0241(56) & Worcester BF 0241(57)

28 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects