Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 23, 2024

December 1, 2024

November 30, 2027

100779 Bear Rd

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

100779 Bear Rd, Wheaton Springs, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Mountain Pass Joint Point of Entry (JPOE) HVAC Maintenance Services. When preparing and submitting a bid, compliance with the instructions found herein is imperative. California Law Requires Disabled Veterans Business Enterprise (DVBE) participation. All bidders for this solicitation, must meet the minimum DVBE participation requirement of 5%. Bidders are eligible to receive a DVBE incentive for their participation. For more information regarding this option, see section M of the IFB entitled "Preference and Incentive Programs." In accordance with the provisions of Section 1770, 1773 and 1773.1 of the Labor Code, the Director of the Department of Industrial Relations (DIR) has ascertained general prevailing wage rates in the county in which the work is to be performed. The rates of prevailing wage are determined by the Department of Industrial Relations (DIR), Labor Statistics and Research.Agreement Term The term of the resulting agreement is anticipated to be effective from December 1, 2024 through November 30, 2027. The agreement term may change if CHP makes an award earlier than expected or if CHP cannot execute the agreement in a timely manner due to unforeseen delays. CHP reserves the right to extend the term of the resulting agreement as necessary to complete or continue the services. Agreement extensions are subject to satisfactory performance, funding availability, and possibly approval by Department of General Services (DGS). The resulting agreement will be of no force or effect until it is signed by both parties and approved by DGS, if required. Bidder is hereby advised not to commence performance until all approvals have been obtained. If performance commences before all approvals are obtained, said services may be considered to have been volunteered. Questions Due August 16, 2024 @ 10:00 a.m. Bidders shall submit questions via email to Mr. Joshua Wickland at joshua.wickland@chp.ca.gov.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.