Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 25, 2024

November 25, 2024

December 25, 2025

2540 Research Park Dr

New Construction, Site Work

No Information to Display

$7,248,000.00

Public - State/Provincial

img_map_placeholder

2540 Research Park Dr, Lexington, KY

63

32

21

4

Subscribe to View Full Documents

**Bid Date was extended to 09/25/24 per Addendum 1** The University of Kentucky CAER (Center for Applied Energy Research) Carbon Fiber Development facility will serve as a research hub where researchers transform coal into a carbon fiber product. The process involves four distinct steps that begin with mixing coal into a hydrocarbon solvent. Once this occurs, raw coal powder will be transformed into a solvent. The coal/solvent will then be heat treated in enclosed Parr reactors (digestion/hydrotreating). The product of the digestion will then be distilled using a B/R Instruments distillation system. The product of this distillation is an isotropic pitch, which is then thermally processed in a closed system to form a mesophase pitch. The project includes the construction of a new one-story assembly building on the UK CAER campus. The occupancy group is (B) business with a type 2B, noncombustible construction type. The building will be non-sprinklered and has an overall area of 6,234 SF. The project will be constructed from prefabricated steel trusses and structural steel columns. The building form will be a single-pitched roof clad in corrugated metal panels. . The Question Deadline is 09/11/2024 at 1:00pm Lexington, KY time. Reminder that all questions are to be sent to cckbidquestions@uky.edu

53 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects