Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 13, 2024

October 14, 2024

April 30, 2025

702 W College Ave

Renovation

No Information to Display

$491,420.00

Public - State/Provincial

img_map_placeholder

702 W College Ave, Normal, IL

15

11

4

3

Subscribe to View Full Documents

CEFCU Arena Fire Alarm Upgrades Provide All Labor, Equipment, and Materials for the Illinois State University Cefcu Arena Fire Alarm Upgrades. An Electrical Prime Will Serve as the General Contractor for the Project With the Expectation to Subcontract All Other Work Outside of the Electrical Scope. Contractor Will Procure, Install, and Commission an Upgraded Fire Alarm System for the Cefcu Arena Per the Ked Design Documents Provided. All Existing Detection and Initiating Devices Will Be Replaced at Their Existing Locations With Addressable Units. The Notification Scheme Has Been Updated to Provide Comprehensive Coverage in the Arena and Includes Av Speaker/strobes in New Locations as Well as Two Large 360 Degree Speakers Installed on the Mezzanine. Bid Security in the Form of a Bid Bond, Certified Check, Cashier's Check, or Bank Money Order, Payable to the Board of Trustees of Illinois State University, in the Amount of: General $ 5% of Bid A Letter From a Surety Company in Substantially the Form Set Forth in the Instructions to Bidders Assuring the Issuance of the Performance and Payment Bond. One (1) Completed Copies of the Illinois Department of Human Rights Form Pc-2, Entitled "Bidder's Employee Utilization Form Construction". 3. Form a or Form B: Certifications & Additional Terms, Disclosures and Conflicts of Interest Vendor/contractor Use of Subcontractors Bids May Not Be Withdrawn After the Opening of Bids.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.