Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 7, 2024

January 8, 2025

March 15, 2026

Multiple Locations

Site Work

No Information to Display

$1,000,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Winnipeg, MB

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The new 115kV PW75 transmission line in its entirety is approximately 51 km in length, connecting Pointe du Bois to Whiteshell Station, via the Lee River Distribution Supply Center (DSC). The scope of Work shall include construction access, clearing, geotechnical exploration, foundation and anchor installation, tower assembly, tower erection, conductor stringing, optical ground wire (OPGW) and overhead ground wire stringing of the 23 km portion of the PW75 transmission line between Pointe du Bois and the tap structure east of the Lee River DSC, as well as include construction access, clearing, geotechnical exploration, and select foundation and anchor installation of the 28 km portion of the PW75 transmission line between the tap structure and Whiteshell Station. There are also works required for the sites between the tap structure and the Lee River DSC, the R1/R2 line near Pointe du Bois Station, and salvage of existing double circuit 66kV P3/P4 between Pointe du Bois and Lee River DSC. Proposals for construction on approximately 46.5km of a new 115kV transmission line (PW75) from the existing Pointe du Bois Station, located at Pointe du Bois, Manitoba, to the existing Whiteshell Station, located approximately 2km west of Seven Sisters Falls, Manitoba. The Site is located between Pointe du Bois and Seven Sisters Falls, Manitoba. The new 115kV PW75 transmission line in its entirety is approximately 51km in length, connecting Pointe du Bois Station to Whiteshell Station, via the Lee River Distribution Supply Center (DSC). This RFP constitutes the first part of Manitoba Hydro's PW75 Transmission Line work. This first part includes full construction of PW75 between Pointe du Bois and the Lee River DSC. It also includes some (but not all) construction works for PW75 between the tap structure east of the Lee River DSC and Whiteshell Station. The second part of Manitoba Hydro's PW75 Transmission Line work, for remaining construction of PW75 between the Lee River DSC and Whiteshell Station, shall be tendered at a later date and does not form part of this Request. Work required at a small quantity of structures on R1/R2 and P1/P2 near Pointe du Bois is included in this RFP. Salvage of P3/P4 between Pointe du Bois and the Lee River DSC is included in this RFP. A detailed description of the scope of work is within Appendix 3 of Schedule II - Technical Requirements, within Part B-Contract Documents of this Request. Question Acceptance Deadline: 2024/09/18 12:00:00 AM CDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.