Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

November 4, 2024

March 4, 2025

NJ-34

Site Work

No Information to Display

$1,000,000.00

Public - City

img_map_placeholder

NJ-34, Aberdeen, NJ

11

20

10

4

Subscribe to View Full Documents

The Work Includes the Furnishing of All Labor, Material and Equipment Necessary or Required to Complete All Work Set Forth in These Specifications and Shown on the Plans. The Estimated Item Quantities Are Summarized as Follows: Approximate Estimated Item Quantities 1. Mobilization Ls 2. Clearing Site Ls 3. Test Pits 2 Un 4. 14" Pvc Force Main - Open Cut 50 Lf 5. 16" Hdpe Force Main - Directionally Drilled 980 Lf 6. Force Main Bypass Pumping to Include All Pipe, Valves, Fittings, and Chamber Complete 1 Un 7. Interconnection Chamber to Include All Pipe, Valves, Line Stops With Bypass, Fittings and Vault, Complete 1 Un 8. Fittings, 14" Bend 2 Un 9. 14" Dip Cap 1 Un 10. 16" Hdpe to 14" Pvc Connection Coupling 2 Un 11. Trench Stabilization, Soil Aggregate I-8, Size #57 50 Lf 12. Dense Graded Aggregate, 6" Thick 10 Sy 13. Bids Must Be Made on the Standard Proposal Form in the Manner Designated Therein and Must Be Enclosed in a Sealed Envelope Bearing the Name and Address of the Bidder and the Name of the Project on the Outside, Addressed to the Old Bridge Municipal Utilities Authority, and Must Be Accompanied by Certified Check, Bid Bond or Cashier's Check Drawn to the Order of the Old Bridge Municipal Utilities Authority for Ten Percent (10%) of the Total Amount Bid, Provided Said Security Need Not Be More Than $20,000.00. All Bid Guarantees Shall Be Accompanied by an Executed Consent From an Approved Surety Company, Licensed to Conduct Business in the State of New Jersey, Agreeing to Furnish the Required Performance and Maintenance Bond Upon the Award of Contract. The Signed Proposal Forms and Bid Security Must Be Delivered to the Place and on or Before the Hour Named Above. The Accepted Bidder Must Sign the Contract Within Ten (10) Days After the Notice of Award or Forfeit His Bid Security. Bid Securities Will Be Returned to All but the Three Apparent Lowest Responsible Bidders. All Other Bid Securities Will Be Returned Within Three Days After Awarding and Signing of the Contract and Approval of the Contractor's Performance Bond, Saturdays, Sundays, and Holidays Excepted. This Contract is Subject to the Provisions of the New Jersey Local Public Contracts Law, N.j.s.a. 40a:11-1, Et Seq. Bidders Are Required to Comply With the Requirements of N.j.s.a. 10:5-31 Et Seq. And N.j.a.c. 17:27 (Affirmative Action Law); P.l. 2004, C.57 (Business Registration Act); and P.l. 2003, C.91 (Public Works Contractor Registration Act). Sealed Bids for This Project Are Being Solicited Through a Fair and Open Process in Accordance With N.j.s.a. 19:44a-20.5 Et Seq. The Right is Reserved to Reject Any or All Proposals, in Whole or in Part, or to Make Awards to Such Bidder or Bidders Who, in the Judgment of the Old Bridge Municipal Utilities Authority is the Lowest Responsible Bidder and to Waive Such Informalities as May Be Permitted by Law. R FILE NO. M-0010-0360-000 (S2953)

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects