Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 1, 2024

November 18, 2024

August 15, 2026

Multiple Locations

Paving, Site Work

No Information to Display

$11,200,000.00

Public - City

img_map_placeholder

Multiple Locations, Parkland, FL

84

8

10

5

Subscribe to View Full Documents

This project also includes roadway resurfacing within the Ranches Subdivision which consists of but is not limited to: milling and resurfacing the roadways which may include reworking the existing base, reversing the existing roadway cross slope where called for in the plans and reconstruction of the roadway where called for in the plans. The work also includes embankment, sod and partial driveway reconstruction to harmonize and tie-in to existing access along with guardrail installation where called for in the plans. The scope also includes signing and pavement markings to replace the impacted pavement markings from resurfacing as well as convert a portion of Trotters Lane / NW 72 Street into a one-way roadway and the placement of blue RPMs at fire hydrant locations along with other improvements as shown in the plans. All in accordance with the terms, conditions, and specifications contained in this proposal The City of Parkland, Florida (CITY) herby solicits proposals from State Certified General Contractors to perform activities and tasks identified in the documents contained in this RFP. These documents represent the Plans, Technical Specifications and Proposal Cost Schedule for the Ranches Drainage project which includes, but is not limited to, dredging of roadside canals, clearing and grubbing of canal banks, tree and vegetation removal, earthwork (cut/fill), bank restoration, sodding, replacement of culverts and end walls, and driveway restoration. Also included is the demolition of an existing stormwater outfall structure and pump to be replaced with a new stormwater outfall structure and two stormwater pumps. Question Deadline: Thu Aug 29, 2024 5:00:00 PM

68 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects