Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 20, 2024

March 1, 2027

May 31, 2027

E Welches Rd

Paving, Site Work

No Information to Display

$2,030,000.00

Public - County

img_map_placeholder

E Welches Rd, Mount Hood Village, OR

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Procurement Process and Technical Questions: Tralee Whitley at Twhitley@clackamas.us The duration of the design of this project is assumed to be from November 2024 through January 2027 for the completion of design and right-of-way tasks. Bidding and Construction will occur between March 2027 and May 2027. Deadline to Submit Clarifying Questions................................ August 13, 2024, 5:00 PM, Pacific Time PROJECT UNDERSTANDING This project will provide facilities for pedestrians to safely travel along Welches Road, including potential for a sidewalk through the commercial area near US Highway 26 transitioning into an 8-foot-wide multi-use path. Project Limits: The intersection of US Highway 26 to Birdie Lane. Lane Configuration and Geometry: An 8-foot-wide multi-use pathway generally separated from the roadway. Stormwater Management: Best Management Practices (BMP's) and Low Impact Development Approaches (LIDA) to be utilized per Water Environment Services (WES) design standards as adopted and modified by Clackamas County Department of Transportation and Development. Generally located between the road and the pathway. Franchise Utilities: Relocate overhead as necessary, relocate for utility conflicts by utilities. SUMMARY OF WORK Project management, survey, environmental and stormwater/hydraulic services, utility coordination, geotechnical, traffic engineering, public outreach, and the development of both preliminary design criteria and final PS&E (Plans, Specifications and Estimates) design, right-of-way services, and bid assistance up through bid award for this project based on the scope of services described herein. Task 1.0 Project Management and Project Coordination Task 2.0 Survey, Field Investigations and Mapping Task 3.0 Environmental Reconnaissance and Permitting Task 4.0 Stormwater / Hydraulics Related Services Task 5.0 Utility Coordination Task 6.0 Alignment Alternatives Conceptual Design Task 7.0 Public Involvement/Outreach Task 8.0 Preliminary Design (30%) Task 9.0 Final Design (60%, 90%, and 100% Bid Ready) Task 10.0 Right-of-Way Research, Descriptions, Appraisals and Acquisitions Task 11.0 Bid and Award Assistan

29 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.